
BCA-ALIGNED · TR78 COMPLIANT · CAAS UNMANNED AIRCRAFT LICENSED PILOTS
Smarter Periodic Facade Inspection in Singapore. Safer Buildings.
Professional Periodic Facade Inspection services for MCSTs, building owners, commercial and industrial properties across Singapore – led by a BCA-registered Competent Person with experience in more than 300+ PFI projects.
We use drone technology to efficiently conduct the 100% visual facade inspection required by BCA with minimal disruption. We comply with the TR 78 standard when using drones for the inspection. The required 10% close-range inspection will be carried out using physical access methods.
300+
PFI PROJECTS
1998
PE SINCE
TR 78
DRONE COMPLIANT
100%
BCA SUBMISSIONS

Displays more block tools
WHAT WE DO
Facade inspection services built around the BCA notice

100% Visual Inspection, TR78 compliant
High-resolution drone inspection of elevated and inaccessible areas, flown by valid CAAS-licensed unmanned aircraft pilots.

Close-range Inspection
At least 10% close-range physical inspection per facing using access methods like gondolas, scaffoldings, rope access. Use of non-destructive tools like tapping rods, borescopes, moisture meter.

BCA Submission & Advisory
Formal document preparation by our Competent Person, submission to BCA and defect remediation guidance.
THE PROCESS
From BCA notice to remediation
Buildings more than 20 years of age and more than 13 meters in height must be inspected every seven years, with specific exceptions. BCA will issue a notice to building owners. The stages for Periodic Facade Inspection (PFI) are shown below.
01
Receipt of Notice and CP Appointment
Upon receiving BCA notice, the MCST or building owner must appoint a qualified Competent Person (CP) to lead the inspection.
02
Site Survey
CP, Facade Inspector and drone operator will arrange to do a site survey.
03
Visual Inspection
The CP and his drone operator conduct a 100% visual inspection of the building facade using drones.
04
Close-range Inspection
The CP with the assistance of a qualified Facade Inspector, perform a physical close-range inspection of at least 10% per building face using methods like tapping.
05
Defect Analysis
Findings are systematically categorized according to severity levels, cross-checked for millimeter-level precision and georeferenced against specific facade zones.
06
Report & Submission
CP signs off and submits report to BCA.
07
Remediation Support
CP advise and provide support on defect remediation.
INSPECTION INSIGHTS
Below are some inspection insights from PFI projects handled by our Competent Person.
Metal Claddings
A piece of metal cladding panel was removed to examine the concealed connection system and its condition.
Bukit Panjang Plaza
View Project →Concrete Cracks
Concrete surface cracks was detected on a structural column. Close-up inspection was conducted to check if the crack has penetrated the substrate concrete.
40 Penjuru Lane
View Project →Damaged Attachment
Damaged attachment discovered that poses a safety hazard and needed to be repaired or replaced.
Singapore Indoor Stadium
View Project →Numerous Building Faces
The numerous building faces required a slightly higher close-up inspection area of 11.50%.
The Gemini
View Project →Granite Stone Facade
A challenging heavy weight facade. Five pieces of stone granite were removed to inspect the underlying anchoring system.
The West Mall
View Project →FAQ
Common questions about Periodic Facade Inspection (PFI)
Is PFI mandatory in Singapore?
Yes, PFI is enforced by BCA. For buildings more than 20 years old or taller than 13 metres, they must undergo a comprehensive façade inspection every 7 years. Once BCA issues a PFI notice, the building owner is legally required to appoint a Competent Person (CP) to carry out the inspection.
What are the PFI services offered by your company?
We offer end-to-end PFI services from project planning, site access planning, inspection supervision, inspection data management, defect identification and mapping, Competent Person report preparation, BCA report submission and remediation advisory.
What type of defects does your company look out for during the inspection?
Our inspection looks for defects not limited to Cracking of concrete, masonry, rendering, or glass; Delamination and Detachment of coatings, paint, tiles and claddings; Biological Growth and Efflorescence; Incorrect Fitment of window frames, loose fins, or inadequate bracket support systems; Corrosion and Rusting of metal cladding or exposed rebar in concrete; Signs of Structural Distress on the building exterior.
How long does it take to complete a project?
The standard inspection workflow is Appointing a CP & Securing Permits; Visual Inspection using drone and physical Close-range Inspection using gondolas, rope access, or boom lifts; Reporting to BCA and Remediation for any unsafe defects.
The completion time could take 4 to 8 weeks or more depending on the size and complexity of the building, accessibility, façade complexity, weather conditions, residents coordination and the number of defects requiring close-range verification.
Can your services be tailored to fit my budget?
Yes, we can tailor the services to manage costs however, the scope of the inspection itself cannot be compromised. We can optimize your budget through cost-saving strategies.
Do you offer ongoing support after project completion?
Yes, our ongoing support includes defect tracking and repair verification;
BCA submission and liaison to address any authority queries, long-term maintenance recommendations to prevent systemic deterioration.
Received a BCA PFI notice?
Contact us for a free consultation and we will go through with you the scope and costs of our services.

